TES are harnessing the power of the latest BIM 360 technology in order to help improve data centre design efficiency for our clients. BIM 360 is a powerful platform that enables TES to efficiently communicate, collaborate and deliver our projects by combining mobile technologies at the point of construction with cloud-based collaboration and reporting.
By utilising BIM 360 TES are able to improve efficiency and productivity during design, pre-construction and construction phases of projects, reducing re-work, improving project delivery times and cutting construction periods. TES are able to share documents including 3D design models and reports in real time with global clients improving project collaboration and encouraging innovation.
TES has its own in-house team consisting of designers, project managers, engineers, fabricators and electricians and have purpose built manufacturing and testing facilities, making TES an ideal choice for clients looking to develop or refurbish data centres.
Commenting on the benefits of utilising BIM 360 TES Power Operations Director Martin Brannigan said “using our BIM 360 platform makes it possible for our clients to achieve a range of potential efficiency improvements on their data centre projects and also encourages collaboration between all delivery partners.”
TES manufacture & supply a range of solutions for data centres including HV Switches, Transformers, Busbar, Main Panels, PDU’s as well as PME systems to suit exact project requirements, off-site manufactured solutions are also provided to clients seeking to further reduce on-site construction times.