Contract Summary:
The Belcarra and Lahardane WwTP’s were required to meet National and European environmental legislation with TES selected as the design and built contractor following a competitive tender process. TES were also responsible for the operation of both Belcarra WwTP and Lahardane WwTP for a period of 3 months.
Contract Specifications:
The TES team were responsible for all works under the projects including civil, mechanical and process design, civil works, MEICA works and operation of the plants;
New Belcarra WwTP:
- Maintain current treatment levels during Design Build stage.
- Inlet flow measurement and sampling.
- New primary settlement tanks.
- New forward feed pump station.
- New Rotating biological contactor.
- New Secondary settlement tank.
- New sludge return pump station.
- Provision for sludge holding.
- Final effluent flow measurement and sampling.
- Refurbishment of existing control building.
- Design and manufacture of new MCC.
- New surface drainage, surfacing, landscaping and fencing.
New Lahardane WwTP:
- New 6mm automatic inlet spiral screen.
- Inlet flow measurement and sampling.
- New inlet pump station with provision for storage.
- New chemical dosing package with bunded storage.
- New emergency shower and eyewash.
- New fine bubble diffused aeration (FBDA) system.
- New secondary settlement tank.
- New sludge waste / return pump station.
- Sludge holding tank.
- New final effluent (washwater) pump station.
- Final effluent flow measurement and sampling.
- Refurbishment of existing control building.
- Design and manufacture of new MCC.
- New surface drainage, surfacing, landscaping and fencing.
Date
2017-2018
Client
Irish Water
Contract Value
€1.1m