Belcarra and Lahardane WwTP's

Contract Summary:

The Belcarra and Lahardane WwTP’s were required to meet National and European environmental legislation with TES selected as the design and built contractor following a competitive tender process. TES were also responsible for the operation of both Belcarra WwTP and Lahardane WwTP for a period of 3 months.

Contract Specifications:

The TES team were responsible for all works under the projects including civil, mechanical and process design, civil works, MEICA works and operation of the plants;

New Belcarra WwTP:

  • Maintain current treatment levels during Design Build stage.
  • Inlet flow measurement and sampling.
  • New primary settlement tanks.
  • New forward feed pump station.
  • New Rotating biological contactor.
  • New Secondary settlement tank.
  • New sludge return pump station.
  • Provision for sludge holding.
  • Final effluent flow measurement and sampling.
  • Refurbishment of existing control building.
  • Design and manufacture of new MCC.
  • New surface drainage, surfacing, landscaping and fencing.

New Lahardane WwTP:

  • New 6mm automatic inlet spiral screen.
  • Inlet flow measurement and sampling.
  • New inlet pump station with provision for storage.
  • New chemical dosing package with bunded storage.
  • New emergency shower and eyewash.
  • New fine bubble diffused aeration (FBDA) system.
  • New secondary settlement tank.
  • New sludge waste / return pump station.
  • Sludge holding tank.
  • New final effluent (washwater) pump station.
  • Final effluent flow measurement and sampling.
  • Refurbishment of existing control building.
  • Design and manufacture of new MCC.
  • New surface drainage, surfacing, landscaping and fencing.
Date
2017-2018
Client
Irish Water
Contract Value
€1.1m